Florensis (NL) Projekt referencyjny

Florensis (NL)

The first pile was driven on 5 October 2018 for the construction of 60.000 m2 greenhouse in Dinteloord (NL). With this new location, Florensis is further expanding the production facilities for young plants. This additional production location is essential for Florensis to maintain the highest level of quality and high delivery reliability. The total greenhouse area of ​​60.000 m2 consists of 18.000 m2 cabrio greenhouse and 42.000 m2 of VENLO greenhouse.

The modern industrial building will occupy 4.500 m2 and will be equipped with solar panels that meet the electricity needs of the project. The greenhouses are also efficiently laid out so that young plants can be grown with minimal energy consumption.

 

 


  • Florensis (NL)
  • Florensis (NL)
  • Florensis (NL)
  • Florensis (NL)
  • Florensis (NL)
  • Florensis (NL)
  • Florensis (NL)
  • Florensis (NL)
  • Florensis (NL)
  • Florensis (NL)
  • Florensis (NL)